Home World News Atal Tunnel – 6 interesting facts about this engineering marvel!

Atal Tunnel – 6 interesting facts about this engineering marvel!

93
0
Atal Tunnel Rohtang
PM Narendra Modi

Prime Minister Narendra Modi on Saturday inaugurated “Atal Tunnel” in Rohtang, which is the highest altitude tunnel in the world and has strategic significance. The historic decision to construct a strategic tunnel below the Rohtang Pass was taken on June 3, 2000 when Atal Bihari Vajpayee was the Prime Minister.

The Union Cabinet decided in 2019 to name the Rohtang Tunnel as Atal Tunnel to honour the contribution made by Atal Bihari Vajpayee.

Interesting facts about Atal Tunnel in Rohtang:

1) The 9.02 km long tunnel connects Manali to Lahaul-Spiti valley throughout the year. This road used to be remained impacted for about six months every year owing to snowfall. The tunnel is built with ultra-modern specifications in the Pir Panjal range of Himalayas at an altitude of 3000 metres (10,000 feet) from the Mean Sea Level (MSL).

2) The tunnel reduces the road distance by 46 km between Manali and Leh and the time by about four to five hours. The hard work put in by Border Roads Organisation in the last 10 years is reaching the final stage.

3) The South Portal (SP) of Atal Tunnel is located at a distance of 25 km from Manali at an altitude of 3,060 metres, while the North Portal (NP) of the tunnel is located near village Teling, Sissu, in Lahaul Valley at an altitude of 3,071 Metres.

4) It is horseshoe-shaped, single tube double lane tunnel with a roadway of 8 metres. It has an overhead clearance of 5.525 metres. Also, it is 10.5-metre wide and has a 3.6 x 2.25 metres fire-proof emergency egress tunnel built into the main tunnel itself. There are 18 egress tunnels where after every 500 metres there is an opening in case of emergency. If any fire incident happens so first thing is how the people trapped are to be rescued. For that there is an entry at every 500 metres.

5) Atal Tunnel has been designed for traffic density of 3000 cars per day and 1,500 trucks per day with max speed of 80 km/hr. It has the state of the art electromechanical system including semi transverse ventilation system.

6) The tunnel has ample safety features built into it including telephone connections at every 150 metres for emergency communication, fire hydrant mechanisms at every 60 Metres, auto incident detection system with CCTV cameras at every 250 metres, air quality monitoring at every one Km, evacuation lighting/exit signs and broadcasting system throughout the tunnel among others.

The feasibility study for the Atal Tunnel was first done in 1990. The foundation stone for the access road to the south portal of the tunnel was laid on May 6, 2002. The first blast took place in 2010 and the last blast in 2017. The tunnel was constructed using drill and blast NATM (New Austria Tunnelling Method) techniques.

Officials said the Border Roads Organisation (BRO) worked relentlessly to overcome major geological, terrain and weather challenges that included the most difficult stretch of the 587-metre Seri Nalah Fault Zone. The breakthrough from both ends was achieved on October 15, 2017.

LEAVE A REPLY

Please enter your comment!
Please enter your name here